NEWS

Short term closure of the footbridge at Bo’ness Railway Station from Monday 4 February 2019

In order to maintain this footbridge, we need to remove it temporarily to give it a full restoration and coating.

In doing this we can ensure that the whole structure survives, fully protected, for the future generations. The footbridge will be back in place at the start of April 2019 and once again visitors will be able to use it to cross the tracks and enjoy the views across the railway and surrounding area.